Again, this is a hodge podge of pictures from our last visit.

We’re really happy with the work these guys are doing with the stonework around the pool.  It is a real jig-saw but the end result will be wonderful.  Next step is for the tile “expert” to come and start with the tiny tiles on the interior.














This is the floor in your room.  The tiles are “artisanal”.  That means they are made by hand and not by machine.  It also means that each one is different and not necessarily 100% square.  We saw this in another project and loved it.  The workman made up three different colour options for the grouting – white, grey and rose.  We opted for the grey figuring the white would end up that way sooner or later.  They are soaked in water before being stuck to the floor – that accounts for some of the colour difference as well  They will have two coats of silicone sealant.  There will also be a 10 cm baseboard with the same tiles.

The roof over the terrace is now finished and we are very happy.  From every vantage point there are great views.  We’ll strategically plant bushes to cover the bits that aren’t so pleasing.

Concrete has been poured for both the covered and open terraces.  The architect showed us several different design options for the floor tiles and we deferred a decision until the windows and doors are in place.

This week they should have laid the tiles in the master bedroom, poured the concrete for the kitchen floor and finished the last stone wall separating us from our neighbours.  We’ll see how well the workers have done on Saturday.

1 comment:

  1. Hey Ren & Serge!! FABULOSO!! The place is just coming together fabulously. I love everything and cannot wait to to see it in person. It is sooooooooooo exciting - so much progress. Hugs l & j xo