It’s really starting to look like a house (well at least a
building).
We now have a completed, if crude, staircase all
the way to the second floor. The stairwell will
have one wall of red brick. To the right
of the brick will be a large window looking west over the cliffs and town
(well, and the neighbour's too).
They have started to plaster over the interior walls. There will be in an initial coat
(what you see here) and then a finer coat at the end. We’ll leave all the plastered walls white for
the time being but may add some colour later.
This is looking west out of the kitchen.
The stove will go in the middle with a built-in microwave over top and
cupboards on either side of the windows.
The stone wall around the parking area is also almost
finished. There will also be a storage
room at that level for “stuff”. There
will be two staircases going up to the terrace.
You can’t see the one on the left.
The one on the right curves around to the top.
We're going back on Easter weekend when expect (hope) to have a second floor.
Watch this space.